Optimal maintenance of renewed system with loaded reservation taking into account the operation time of each element

Authors

  • O. I. Peschanskii

Abstract

A semi-markov model of maintenance of a parallel structure has been constructed taking into account the total prefailure operation time of each element. Stationary indeces of the system operation quality have been found. Optimal values of the operation time for the elements have been determined for preventive maintenance.

Author Biography

O. I. Peschanskii

Песчанский А.И.

Issue

Section

Methods of optimization, optimum control and theory of games