Optimal maintenance of renewed system with loaded reservation taking into account the operation time of each element
Abstract
A semi-markov model of maintenance of a parallel structure has been constructed taking into account the total prefailure operation time of each element. Stationary indeces of the system operation quality have been found. Optimal values of the operation time for the elements have been determined for preventive maintenance.Downloads
Issue
Section
Methods of optimization, optimum control and theory of games